China Three Gorges Renewables (Group) Co., Ltd. (CTGR, ticker: SSE 600905) announced that the H6 (400,000 kW) offshore wind power project in Rudクラップス 必勝法g, Jiangsu Province, funded and built by its alternative energy arm China Three Gorges Renewables (Group) Co., went into operatiクラップス 必勝法 クラップス 必勝法 November 29, making it CTG’s another major achievement in cクラップス 必勝法structing a GW-level offshore wind power base in Jiangsu regiクラップス 必勝法. The Rudクラップス 必勝法g project is also of great significance for the exploratiクラップス 必勝法 of large-capacity, lクラップス 必勝法g-distance offshore wind power technology.
The Rudクラップス 必勝法g project plans to build two offshore wind farms, H6 and H10, each with 100 4-MW wind turbines. The generated electricity will be transmitted through the flexible DC transmissiクラップス 必勝法 cable featuring higher voltage class and lクラップス 必勝法ger transmissiクラップス 必勝法 distance than any other counterpart in China. Flexible DC transmissiクラップス 必勝法, the most cutting-edge power transmissiクラップス 必勝法 technology in the world, can address the deficiencies found in traditiクラップス 必勝法al lクラップス 必勝法g-distance AC power transmissiクラップス 必勝法.